Engineering Changelog📅2026-08-01⏱️1 min read
Product launch checklist ingested into knowledge base
Hand-written knowledge-base event (not a `kb-sync` window). Does not update `.kb-state`.
Product launch checklist ingested into knowledge base
Hand-written knowledge-base event (not a kb-sync window). Does not update .kb-state.
What landed
- Added
../operations/product-launch-checklist.md— master tracker for JSGlobtech (client_id: jsglobtech) product launch, GEO/AI indexing, off-site authority, multi-tenant lead engine, and demo readiness. - Statuses seeded from a 2026-08-01 repo audit (robots,
llms.txt, Zod leads, Apps Script path, schema) plus the prior 2026-07-31 live lead probe documented in../sales/tenant-demo-checklist.md. - Linked from
../README.md,../operations/README.md,../sales/README.md,../sales/demo-framework.md, and../sales/tenant-demo-checklist.md.
Why
Client demos need a single place to mark checklist items done vs open (Bing/GSC, AI robots, directories, Sheet webhook, Custom GPT, curl fallback) without scattering status across sales and architecture notes.
Follow-ups
- Flip boxes in the tracker as work completes; keep the Pre-demo gate section accurate before pitch calls.
- Engineering quick wins called out in the tracker: extend
app/robots.tsforOAI-SearchBot/Google-Extended; confirm Production webhook + Sheet; set up Custom GPT Action.